
Teletec is fully experienced with overseas business and banking practices, international tenders, project implementation processes, technical norms in various parts of the world and specific exporting protocols.
Systems Projects (partial list)
- Iraq - Project &Contracting Office- U.S. Army
- Supply and Installation of 2400 UHF Radios with Encryption
- Iraq Telecommunications Post Commission
- Transmission System 26 PDH Long Haul Microwave Links Complete with Multiplex Equipment, Antennas, Power System and Test Equipment
- Jordan - Special Commission Communications (SCC)
- PDH/SDH Transmission System Phase 5 and 6
- UAE , Sharja
- VHF Duplex Security System
- Dubai
- Automatic Number Identification System
- Jordan Water Authority
- VHF Telecommunication System
- Middle East
- VHF Communication System for Fire Fighting and Prevention
- Middle East
- VIP VHF Network
- Dubai
- Computer Aided Dispatch Center
- Kuwait
- Vehicle Tracking and Positioning System linking GPS to New Mobile GSM Network and Kuwait Map Digitizing
- Jordan
- Tele-Medicine Microwave/Satellite Two Way Video/Audio/Data System (Connecting Mayo Clinic USA with Jordanian Hospitals and Universities)
- Jordan
- Highway Emergency Call-Box System
- UAE , Abu Dhabi
- Mobile TV and Microwave Security System
- Saudi Arabia - Arab Oil Company (AOC)
- VHF/UHF Networks
- Kuwait
- Oil Fields Microwave System
Power Generation and Transmission Projects
- Kuwait
- Underground Cables Network comprising 300 KV Underground Oil Filled Double Circuits. Project considered unique and adopted in several other countries.
- Middle East
- Numerous projects including 300 KV Double Circuit Overhead Transmission Lines
- Kuwait Ministry of Electricity and Water
- Introduced Gas Turbine usage as quick solution to Peak Power Demand. Supplied 50 MW Gas Turbine with subsequent purchases by MEW.
- Completed numerous projects involving 132 KV, 300 KV substations of all types including Minimum Oil, Airblast and SF6 Insulated Breakers.
- Maintenance and Upgrade of Transmission and Generation facilities
- Specialize in economical solution to boost power generation of existing Gas Turbines by up to 25% within four months, utilizing same land site and existing staff.
- Spare parts provider
Additional Services