Teletec is fully experienced with overseas business and banking practices, international tenders, project implementation processes, technical norms in various parts of the world and specific exporting protocols.
Systems Projects (partial list)
Iraq - Project &Contracting Office- U.S. Army
Supply and Installation of 2400 UHF Radios with Encryption
Iraq Telecommunications Post Commission
Transmission System 26 PDH Long Haul Microwave Links Complete with Multiplex Equipment, Antennas, Power System and Test Equipment
Jordan - Special Commission Communications (SCC)
PDH/SDH Transmission System Phase 5 and 6
UAE , Sharja
VHF Duplex Security System
Dubai
Automatic Number Identification System
Jordan Water Authority
VHF Telecommunication System
Middle East
VHF Communication System for Fire Fighting and Prevention
Middle East
VIP VHF Network
Dubai
Computer Aided Dispatch Center
Kuwait
Vehicle Tracking and Positioning System linking GPS to New Mobile GSM Network and Kuwait Map Digitizing
Jordan
Tele-Medicine Microwave/Satellite Two Way Video/Audio/Data System (Connecting Mayo Clinic USA with Jordanian Hospitals and Universities)
Jordan
Highway Emergency Call-Box System
UAE , Abu Dhabi
Mobile TV and Microwave Security System
Saudi Arabia - Arab Oil Company (AOC)
VHF/UHF Networks
Kuwait
Oil Fields Microwave System
Power Generation and Transmission Projects
Kuwait
Underground Cables Network comprising 300 KV Underground Oil Filled Double Circuits. Project considered unique and adopted in several other countries.
Middle East
Numerous projects including 300 KV Double Circuit Overhead Transmission Lines
Kuwait Ministry of Electricity and Water
Introduced Gas Turbine usage as quick solution to Peak Power Demand. Supplied 50 MW Gas Turbine with subsequent purchases by MEW.
Completed numerous projects involving 132 KV, 300 KV substations of all types including Minimum Oil, Airblast and SF6 Insulated Breakers.
 
Additional Services
Maintenance and Upgrade of Transmission and Generation facilities
 
Specialize in economical solution to boost power generation of existing Gas Turbines by up to 25% within four months, utilizing same land site and existing staff.
 
Spare parts provider

 

Learn more